Logo
17.12.2020

New neutralisation and reduction installation

Our state-of-the-art neutralisation and reduction installation is ready and already in operation. The new installation ensures that the wastewater produced in our logistics centre is treated in accordance with the Water Protection Ordinance and can be discharged directly into the sewer system.

The completely new installation enables the additional treatment of the Javel wash water, which prevents the potential formation of chlorine gas in the waste water. 

Our logistics centre is now able to autonomously treat its emissions in the gaseous phase (two air scrubbers) and in the liquid phase (neutralisation and reduction installation).

Water protectionNeutralisation and Reduction